Home / Case Studies / MES / CWC and SAP Integration

MES CASE STUDY · ThingWorx CWC + SAP

ThingWorx CWC and SAP Integration for Real-Time Material Consumption

By PSPTechHub · November 2026

Conceptual illustration of connected medical-device production equipment and manufacturing dashboards

SUMMARY

PSPTechHub connected ThingWorx Connected Work Cell (CWC) 9.7 with SAP across the complete production-order lifecycle. Released SAP production orders are brought into CWC automatically, scheduled for work cells and shown to operators with live SAP information. Operators record material consumption, including batch- and serial-tracked materials, complete production steps and send goods movements, operation confirmations and finished-goods receipts back to SAP. SAP stays the system of record for production orders, inventory and production progress.

AT A GLANCE

Industry

Electronics and telecom equipment manufacturing

Solution

Manufacturing execution, material consumption and SAP integration

Platform

ThingWorx Connected Work Cell (CWC) 9.7 with SAP

Users

Production operators and supervisors

Process area

Production order scheduling, material consumption, operation confirmation and finished-goods receipt

Materials covered

Batch-tracked, serial-tracked, standard and bulk materials, including pick-and-place machine files

The Problem: SAP and the Shop Floor Were Out of Sync

Production orders were planned and maintained in SAP, while shop-floor execution was performed through ThingWorx Connected Work Cell. Without an integrated workflow, several production activities required manual effort and duplicate data entry.

Manual production order setup

Production orders released in SAP had to be set up manually in CWC before operators could begin execution.

Limited production order visibility

Operators saw basic production information but not the complete SAP order details needed for execution, including quantities, status and material requirements.

Duplicate material entry

Materials consumed during production were recorded in CWC and then entered again into SAP.

Production progress entered separately

Completed operations had to be communicated back to SAP separately, making synchronized production progress hard to maintain.

Inventory could become out of sync

Delayed or missing material-consumption transactions could make SAP inventory differ from the material actually used on the shop floor.

Risk of material over-consumption

Without validation against the required quantity, operators could record more material than the production order required.

The Solution: Connecting SAP and ThingWorx CWC Across the Production Lifecycle

PSPTechHub connected ThingWorx Connected Work Cell with SAP to create one production workflow from order release through finished-goods receipt. Production information and material transactions move between the enterprise system and the shop floor without unnecessary duplicate entry.

For a different shop-floor workflow, see how ThingWorx CWC and SAP integration connects production orders, material use and finished-stock receipt.

Automated production order import

Released SAP production orders are brought into CWC automatically; the integration retrieves the required information, identifies the production route and prepares the order for scheduling.

Work-cell scheduling

Production planners schedule orders for individual work cells, manage production jobs and load the required serial numbers.

Live SAP order information

The CWC work screen shows the SAP order number, process plan and revision, target, delivered and confirmed quantities, and SAP order status.

Required vs. used material

Operators view the material required for the production order and record the actual quantity used.

Controlled material consumption

Consumption is recorded with batch and serial information where required; the quantity is validated and the Consume action locks once the required quantity is reached.

Bulk and pick-and-place material

Bulk materials and pick-and-place machine-file information are captured as part of the production process, with transactions logged for traceability.

Operation confirmation

When a production step is completed, CWC sends the operation confirmation to SAP.

Finished-goods receipt

After the order is completed, the operator enters the serial or batch information and the finished product is posted into SAP inventory.

SAP response visibility

The operator receives the SAP response for every transaction, so successful postings and errors are identified directly in the workflow.

From SAP Production Order to Finished Stock

1

Production order released in SAP

A production order is released in SAP with the required production and material information.

2

Order imported into CWC

CWC retrieves the released production order from SAP and prepares it for shop-floor execution.

3

Work cell scheduled

The production order is assigned and scheduled for the appropriate work cell.

4

Operator starts production

The operator opens the assigned job and starts production from the CWC work screen.

5

Live order information displayed

The operator sees the latest SAP order number, quantities, status and material requirements.

6

Material requirements retrieved

The required parts list is retrieved from SAP at runtime, so the operator works with current order information.

7

Material consumption recorded

The operator records the materials used, including batch- and serial-tracked materials where required.

8

Consumption validated

The system validates the entry and prevents consumption beyond the required quantity.

9

Material transaction sent to SAP

The material-consumption transaction is posted to SAP as a goods movement against the production order.

10

Operation confirmed

Once the production step is completed, CWC sends the operation confirmation to SAP.

11

Finished product recorded

After the final step, the operator enters the required serial or batch information for the finished product.

12

Finished goods posted to SAP

SAP records the finished product in inventory through the goods-receipt process.

For IT Teams: How It Is Built

For IT Teams: How It Is Built

The solution is designed around clear responsibilities between CWC, ThingWorx services and SAP. SAP remains the official system of record for production-order progress and inventory.

1. ThingWorx CWC work screen

Material Consumption area added to the existing work-execution screen

2. Validation layer

Checks required information and prevents invalid material-consumption entries

3. ThingWorx services

Business logic to retrieve SAP information and send production transactions back

4. SAP connector

Parts lists, goods movements, order information, operation confirmations and goods receipts

5. SAP system of record

Production orders, inventory, material transactions, confirmations and finished-goods stock

Technology responsibilities

Service

Purpose

Parts list from SAP

Retrieves current material requirements directly from SAP at runtime

Goods movement to SAP

Posts material-consumption transactions against the production order

Order import and scheduling

Retrieves released SAP orders, identifies the route and prepares CWC scheduling

Order header details

Confirms completed production operations in SAP

Goods receipt

Posts completed products into SAP inventory with serial or batch information

Pick-and-place file reader

Reads machine files and captures material information and usage records

Consumption table

Records and tracks material consumption for the production order

Design decisions

Live SAP data: production and material information is read from SAP at runtime, not kept as a separate copy

Existing CWC experience: operators complete production tasks from the same work environment

Upgrade-friendly customization: CWC screens are customized through controlled copies and menu configuration

SAP response visibility: every transaction shows whether SAP accepted it or returned an error

Field-level validation: key order and material information is checked before submission to SAP

Controlledmaterial consumption: recording beyond the required quantity is prevented

Traceable machine transactions: pick-and-place file processing logs the relevant transactions

Key Results

Key Results

Automated production order setup

SAP orderCWCImported

One connected production workflow

ProductionConsumptionCompletionConnected

Real-time material transactions

Material usedSAPPosted

Controlled material usage

Required quantityValidationControlled

Batch and serial traceability

BatchSerialTracked

Synchronized production progress

Operation completeSAPConfirmed

Finished-goods inventory integration

Finished productSAP inventoryReceived

Traceable bulk and machine consumption

Bulk materialMachine filesLogged

This solution fits if you need to…

Connect SAP production orders with ThingWorx CWC shop-floor execution

Automate the movement of released production orders into CWC

Give production operators live SAP order information

Record material consumption, including batch- and serial-tracked materials, inside CWC

Prevent material over-consumption through validation

Capture bulk and pick-and-place machine-file consumption

Send goods movements and operation confirmations to SAP

Post completed products into SAP inventory while SAP stays the system of record

Frequently Asked Questions

Frequently Asked Questions

Yes. ThingWorx CWC can be integrated with SAP to exchange production-order information, material consumption, operation confirmations and finished-goods transactions.

Yes. When a production operation is completed in ThingWorx CWC, the operation confirmation can be sent to SAP, keeping production progress synchronized between the shop floor and the enterprise system.

It connects production-order management, shop-floor execution, material consumption, operation confirmation and finished-goods inventory in one workflow, reducing duplicate data entry and improving production visibility.

SAP remains the system of record for production orders, inventory, material transactions and production progress, while ThingWorx CWC provides the shop-floor execution experience for operators.

Yes. Pick-and-place machine files can be processed to identify relevant material usage, which is then recorded and sent through the SAP material-consumption workflow.

Each entry is validated before it is submitted, and once the required quantity is reached the Consume action is locked for that requirement

Yes. PSPTechHub provides manufacturing integration solutions using ThingWorx, MES, SAP and industrial technologies to connect shop-floor operations with enterprise systems.

Yes. ThingWorx CWC can be integrated with SAP to exchange production-order information, material consumption, operation confirmations and finished-goods transactions.

Yes. When a production operation is completed in ThingWorx CWC, the operation confirmation can be sent to SAP, keeping production progress synchronized between the shop floor and the enterprise system.

It connects production-order management, shop-floor execution, material consumption, operation confirmation and finished-goods inventory in one workflow, reducing duplicate data entry and improving production visibility.

SAP remains the system of record for production orders, inventory, material transactions and production progress, while ThingWorx CWC provides the shop-floor execution experience for operators.

Yes. Pick-and-place machine files can be processed to identify relevant material usage, which is then recorded and sent through the SAP material-consumption workflow.

Each entry is validated before it is submitted, and once the required quantity is reached the Consume action is locked for that requirement

Yes. PSPTechHub provides manufacturing integration solutions using ThingWorx, MES, SAP and industrial technologies to connect shop-floor operations with enterprise systems.

Yes. ThingWorx CWC can be integrated with SAP to exchange production-order information, material consumption, operation confirmations and finished-goods transactions.

Yes. When a production operation is completed in ThingWorx CWC, the operation confirmation can be sent to SAP, keeping production progress synchronized between the shop floor and the enterprise system.

It connects production-order management, shop-floor execution, material consumption, operation confirmation and finished-goods inventory in one workflow, reducing duplicate data entry and improving production visibility.

SAP remains the system of record for production orders, inventory, material transactions and production progress, while ThingWorx CWC provides the shop-floor execution experience for operators.

Yes. Pick-and-place machine files can be processed to identify relevant material usage, which is then recorded and sent through the SAP material-consumption workflow.

Each entry is validated before it is submitted, and once the required quantity is reached the Consume action is locked for that requirement

Yes. PSPTechHub provides manufacturing integration solutions using ThingWorx, MES, SAP and industrial technologies to connect shop-floor operations with enterprise systems.

Need Your Shop Floor and SAP in Step?

PSPTechHub builds ThingWorx apps that connect ThingWorx CWC and MES screens to SAP so production and stock always match.

Transforming manufacturing with smart tools, designed for real results.

@Copyright 2026, All rights reserved by @PSPTECH HUB Pvt Ltd.

@Copyright 2026, All rights reserved by @PSPTECH HUB Pvt Ltd.